ITAC Assessment: LS2023
ITAC logo
ITAC Assessment: LS2023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range less than $500
k
# of Employees 450
Plant Area 68,239
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,308,071 24,248,200
kWh
Electricity Demand $621,509 59,480
kW-mo/yr
Natural Gas $559,240 48,743
MMBtu
TOTAL YEARLY COSTS $3,488,820
RECOMMENDED SAVINGS* $476,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $258,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $56,174 $1,000 $56,174
591,300
kWh
-
02 2.7135: Install occupancy sensors $3,665 $1,400 $3,665
38,579
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $189,746 $142,240 $189,746
1,997,324
kWh
-
04 2.7423: Reduce heat gain by window tinting $6,749 $10,831 $6,749
71,044
kWh
-
05 2.4133: Use most efficient type of electric motors $8,548 $14,800 $8,548
89,980
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $193,754 $552,840 $193,754
2,039,520
kWh
-
07 2.1116: Improve combustion control capability $17,898 $60,000 - $17,898
-
MMBtu
TOTAL RECOMMENDED $476,534 $783,111 $458,636
4,827,747
kWh
$17,898
-
MMBtu
TOTAL IMPLEMENTED $258,476 $568,640 $258,476
2,720,800
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs