Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0216 #08 Y:1994 Reduce or eliminate waste $27,580 $412
AM0216 #07 Y:1994 Utilize daylight whenever possible in lieu of artificial light $175 -
AM0216 #06 Y:1994 Make a practice of turning off lights when not needed $190 -
AM0216 #05 Y:1994 Use synthetic lubricant $264 -
AM0216 #04 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $330 $500
AM0216 #03 Y:1994 Install / repair insulation on steam lines $540 $682
AM0216 #02 Y:1994 Analyze flue gas for proper air/fuel ratio $865 -
AM0216 #01 Y:1994 Optimize plant power factor $23,130 $5,500
AM0215 #07 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $460 $930
AM0215 #06 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,510 $1,920
AM0215 #05 Y:1994 Reduce the pressure of compressed air to the minimum required $2,165 $25
AM0215 #04 Y:1994 Reduce illumination to minimum necessary levels $2,240 -
AM0215 #03 Y:1994 Install timers and/or thermostats $2,710 $600
AM0215 #02 Y:1994 Optimize plant power factor $9,610 $12,750
AM0215 #01 Y:1994 Use power during off-peak periods $10,750 -
UF0092 #09 Y:1994 Direct warmest air to combustion intake $2,825 $2,600
UF0092 #08 Y:1994 Replace existing hvac unit with high efficiency model $2,997 $3,600
UF0092 #07 Y:1994 Analyze flue gas for proper air/fuel ratio $8,164 $1,000
UF0092 #06 Y:1994 Replace existing chiller with high efficiency model $3,288 $10,000
UF0092 #05 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $1,078 $500