ITAC Assessment: AM0215
ITAC logo
ITAC Assessment: AM0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Polycrystalline diamond drill bits
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 38,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 4,460
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,483 1,206,331
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3137: Use power during off-peak periods $10,750 - $10,750
-
kWh
02 2.3212: Optimize plant power factor $9,610 $12,750 $9,610
-
kWh
03 2.7261: Install timers and/or thermostats $2,710 $600 $2,710
64,771
kWh
04 2.7111: Reduce illumination to minimum necessary levels $2,240 - $2,240
31,653
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,165 $25 $2,165
29,308
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $1,920 $1,510
22,274
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $460 $930 $460
11,137
kWh
TOTAL RECOMMENDED $29,445 $16,225 $29,445
159,143
kWh
TOTAL IMPLEMENTED $6,375 $2,875 $6,375
94,372
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs