ITAC Assessment: MS0098
ITAC logo
ITAC Assessment: MS0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Venetian Blinds Parts
NAICS
n/a
SIC 2591: Drapery Hardware and Window Blinds and Shades
Sales Range $10
M
to 50
M
# of Employees 217
Plant Area 270,000
ft2
Annual Production 137,795
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,573 5,374,267
kWh
Electricity Demand $93,585 10,772
kW-mo/yr
Electricity Fees $4,037 -
Natural Gas $173,625 53,198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $286,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,029

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $4,696 $1,800 - - $4,696 - - - - - - -
02 2.2437: Recover waste heat from equipment $11,479 $16,045 - - - $11,479
-
MMBtu
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,796 $9,988 $1,182
38,980
kWh
$1,614
-
kW-mo/yr
- - - - - - - -
04 2.2612: Use cooling tower water instead of refrigeration $14,937 $4,826 $9,426
310,961
kWh
$5,511
-
kW-mo/yr
- - - - - - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,885 $23,672 $8,606
283,998
kWh
$5,023
-
kW-mo/yr
- $(-5,744.0)
-
MMBtu
- - - - - -
06 3.1191: Change procedures / equipment / operating conditions $28,149 $2,288 - - - - - - $24,480
-
lb
- - $3,669
07 3.6124: Burn waste oil for heat $1,627 $2,628 - - - $127
-
MMBtu
- - $1,500
-
lb
- - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $107,600 $6,500 - - - - - $97,500
-
lb
- - $10,100 -
09 3.8142: Distill contaminated solvents for reuse $19,279 $15,000 - - - - $19,279
-
gal
- - - - -
10 4.431: Train operators for maximum operating efficiency $88,514 - $2,830
93,494
kWh
$2,484
-
kW-mo/yr
- - - - - $83,200 - -
TOTAL RECOMMENDED $286,962 $82,747 $22,044
727,433
kWh
$14,632
-
kW-mo/yr
$4,696 $5,862
-
MMBtu
$19,279
-
gal
$97,500
-
lb
$25,980
-
lb
$83,200 $10,100 $3,669
TOTAL IMPLEMENTED $130,029 $23,114 $10,608
349,941
kWh
$7,125
-
kW-mo/yr
$4,696 - - $97,500
-
lb
- - $10,100 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings