| Assessment Year | 1997 |
|---|---|
| Principal Product | Venetian Blinds Parts |
| NAICS |
n/a
|
| SIC | 2591: Drapery Hardware and Window Blinds and Shades |
| Sales Range | $10 M to 50M |
| # of Employees | 217 |
| Plant Area |
270,000
ft2
|
| Annual Production | 137,795
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $168,573 | 5,374,267 |
kWh
|
$0.031 |
| Electricity Demand | $93,585 | 10,772 |
kW-mo/yr
|
$8.69 |
| Electricity Fees | $4,037 | - |
|
- |
| Natural Gas | $173,625 | 53,198 |
MMBtu
|
$3.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $286,962 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $130,029 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $4,696 | $1,800 | - | - | $4,696 | - | - | - | - | - | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $11,479 | $16,045 | - | - | - |
$11,479
-
MMBtu
|
- | - | - | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,796 | $9,988 |
$1,182
38,980
kWh
|
$1,614
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | |
| 04 | 2.2612: Use cooling tower water instead of refrigeration | $14,937 | $4,826 |
$9,426
310,961
kWh
|
$5,511
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,885 | $23,672 |
$8,606
283,998
kWh
|
$5,023
-
kW-mo/yr
|
- |
$(-5,744.0)
-
MMBtu
|
- | - | - | - | - | - | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $28,149 | $2,288 | - | - | - | - | - | - |
$24,480
-
lb
|
- | - | $3,669 | |
| 07 | 3.6124: Burn waste oil for heat | $1,627 | $2,628 | - | - | - |
$127
-
MMBtu
|
- | - |
$1,500
-
lb
|
- | - | - | |
| 08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $107,600 | $6,500 | - | - | - | - | - |
$97,500
-
lb
|
- | - | $10,100 | - | |
| 09 | 3.8142: Distill contaminated solvents for reuse | $19,279 | $15,000 | - | - | - | - |
$19,279
-
gal
|
- | - | - | - | - | |
| 10 | 4.431: Train operators for maximum operating efficiency | $88,514 | - |
$2,830
93,494
kWh
|
$2,484
-
kW-mo/yr
|
- | - | - | - | - | $83,200 | - | - | |
| TOTAL RECOMMENDED | $286,962 | $82,747 |
$22,044
727,433
kWh
|
$14,632
-
kW-mo/yr
|
$4,696 |
$5,862
-
MMBtu
|
$19,279
-
gal
|
$97,500
-
lb
|
$25,980
-
lb
|
$83,200 | $10,100 | $3,669 | ||
| TOTAL IMPLEMENTED | $130,029 | $23,114 |
$10,608
349,941
kWh
|
$7,125
-
kW-mo/yr
|
$4,696 | - | - |
$97,500
-
lb
|
- | - | $10,100 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs