ITAC Assessment: UF0092
ITAC logo
ITAC Assessment: UF0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Solar Control Products
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 100,000
ft2
Annual Production 80,000,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,009 2,666,764
kWh
Natural Gas $182,205 27,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,526 $431 $2,526
38,980
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $872 $2,543 $872
13,482
kWh
-
03 2.4133: Use most efficient type of electric motors $2,828 $1,964 $2,828
43,376
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $811 $775 $811
12,603
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,078 $500 $1,078
16,706
kWh
-
06 2.2622: Replace existing chiller with high efficiency model $3,288 $10,000 $3,288
50,703
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $8,164 $1,000 - $8,164
-
MMBtu
08 2.7232: Replace existing hvac unit with high efficiency model $2,997 $3,600 $2,997
45,721
kWh
-
09 2.1213: Direct warmest air to combustion intake $2,825 $2,600 - $2,825
-
MMBtu
TOTAL RECOMMENDED $25,389 $23,413 $14,400
221,571
kWh
$10,989
-
MMBtu
TOTAL IMPLEMENTED $7,304 $5,438 $7,304