ITAC Assessment: SF0161
ITAC logo
ITAC Assessment: SF0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Miniature Pressure Sensors
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 35,500
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,682 3,791,618
kWh
Electricity Demand $67,203 5,197
kW-mo/yr
Natural Gas $16,472 2,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $834 $389 $648
10,551
kWh
$186
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,859 $1,055 $1,444
23,447
kWh
$415
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,053 $1,408 $1,217
19,637
kWh
$349
-
kW-mo/yr
$(-513.0)
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,081 $8,340 $5,626
90,856
kWh
- $(-3,545.0)
-
MMBtu
TOTAL RECOMMENDED $5,827 $11,192 $8,935
144,491
kWh
$950
-
kW-mo/yr
$(-4,058.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs