| Assessment Year | 1988 |
|---|---|
| Principal Product | HEAT EXCHANGERS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 52 |
| Plant Area |
n/a
|
| Annual Production | 400
pieces
|
| Production Hrs. Annual | 2,350
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $44,686 | 740,035 |
kWh
|
$0.060 |
| Natural Gas | $22,074 | 5,470 |
MMBtu
|
$4.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,725 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,098 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $5,363 | $1,200 | - |
$5,363
-
MMBtu
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $1,357 | - |
$694
11,723
kWh
|
- | $663 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $225 | $57 |
$225
3,810
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83 | $159 |
$83
1,465
kWh
|
- | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $4,721 | $13,000 | - |
$4,721
-
MMBtu
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,613 | - |
$2,753
46,600
kWh
|
- | $(-140.0) | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,319 | - |
$1,319
22,274
kWh
|
- | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $44 | $88 |
$44
879
kWh
|
- | - | |
| TOTAL RECOMMENDED | $15,725 | $14,504 |
$5,118
86,751
kWh
|
$10,084
-
MMBtu
|
$523 | ||
| TOTAL IMPLEMENTED | $14,098 | $14,288 |
$3,491
59,202
kWh
|
$10,084
-
MMBtu
|
$523 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs