Assessment Year | 1994 |
---|---|
Principal Product | Chicken & beef fajitas, barbecue brisket, pork & beef sausag |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
66,000
ft2
|
Annual Production | 11,500,000
lb
|
Production Hrs. Annual | 2,024
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,731 | 2,630,715 |
kWh
|
$0.067 |
Natural Gas | $47,519 | 11,343 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,589 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,414 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $23,130 | $5,500 |
$23,130
-
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $865 | - | - |
$865
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $540 | $682 | - |
$540
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $500 |
$330
12,016
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $264 | - |
$264
5,862
kWh
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $190 | - |
$190
7,034
kWh
|
- | - | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $175 | - |
$175
6,448
kWh
|
- | - | |
08 | 3.7214: Reduce or eliminate waste | $27,580 | $412 | - | - | $27,580 | |
09 | 3.7214: Reduce or eliminate waste | $5,515 | $220 | - | - | $5,515 | |
TOTAL RECOMMENDED | $58,589 | $7,314 |
$24,089
31,360
kWh
|
$1,405
-
MMBtu
|
$33,095 | ||
TOTAL IMPLEMENTED | $58,414 | $7,314 |
$23,914
24,912
kWh
|
$1,405
-
MMBtu
|
$33,095 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs