ITAC Assessment: LE0588
ITAC logo
ITAC Assessment: LE0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Tempered Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 45,500
ft2
Annual Production 1,974
ton
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,254 1,119,910
kWh
Electricity Demand $272,219 6,805
kW-mo/yr
Electricity Fees $6,311 -
Natural Gas $10,958 479
MMBtu
TOTAL YEARLY COSTS $419,742
RECOMMENDED SAVINGS* $216,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.8123: Pay utility bills on time $1,523 - - - $1,489 - - $34 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,235 $100 $435
3,752
kWh
$800
-
kW-mo/yr
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,412 $1,256 $845
7,403
kWh
$1,567
-
kW-mo/yr
- - - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,600 $26,934 - $13,600
-
kW-mo/yr
- - - - -
05 2.1321: Replace fossil fuel equipment with electrical equipment $21,726 $56,274 $(-12,294.0)
(-105,972)
kWh
- - - $34,020
-
MMBtu
- -
06 2.2443: Re-use or recycle hot or cold process exhaust air $938 $2,500 - - - $938
-
MMBtu
- - -
07 2.1221: Replace obsolete burners with more efficient ones $175,084 $635,000 $8,930
76,986
kWh
- - - - - $166,154
08 2.7135: Install occupancy sensors $38 $140 $38
329
kWh
- - - - - -
TOTAL RECOMMENDED $216,556 $722,204 $(-2,046.0)
(-17,502)
kWh
$15,967
-
kW-mo/yr
$1,489 $938
-
MMBtu
$34,020
-
MMBtu
$34 $166,154
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs