5,175
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0257 #04 Y:2003 | 04 | 2003 | Burn a less expensive grade of fuel | $335,124 | $425,000 | n/a |
| NC0257 #03 Y:2003 | 03 | 2003 | Recover heat from exhausted steam, hot air or hot water | $42,749 | $55,000 | |
| NC0257 #02 Y:2003 | 02 | 2003 | Recover heat from exhausted steam, hot air or hot water | $24,665 | $10,000 | |
| NC0257 #01 Y:2003 | 01 | 2003 | Use steam pressure reduction to generate power | $169,269 | $200,000 | |
| LM0062 #12 Y:2003 | 12 | 2003 | Modify process to reduce material use/cost | $505,164 | - | |
| LM0062 #11 Y:2003 | 11 | 2003 | Begin a practice of predictive / preventative maintenance | $17,820 | $3,000 | |
| LM0062 #10 Y:2003 | 10 | 2003 | Train operators for maximum operating efficiency | $105,000 | $17,500 | |
| LM0062 #09 Y:2003 | 09 | 2003 | Train operators for maximum operating efficiency | $52,500 | $19,910 | |
| LM0062 #08 Y:2003 | 08 | 2003 | Air condition only space necessary | $17,255 | - | |
| LM0062 #07 Y:2003 | 07 | 2003 | Improve combustion control capability | $666 | $750 | |
| LM0062 #06 Y:2003 | 06 | 2003 | Cool compressor air intake with heat exchanger | $3,170 | $1,950 | |
| LM0062 #05 Y:2003 | 05 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,369 | $410 | |
| LM0062 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $415 | $219 | |
| LM0062 #03 Y:2003 | 03 | 2003 | Use most efficient type of electric motors | $711 | $724 | |
| LM0062 #02 Y:2003 | 02 | 2003 | Utilize daylight whenever possible in lieu of artificial light | $5,246 | - | |
| LM0062 #01 Y:2003 | 01 | 2003 | Utilize higher efficiency lamps and/or ballasts | $3,003 | $6,290 | |
| IA0318 #08 Y:2003 | 08 | 2003 | Reuse / recycle/ sell paper products | $43,920 | $320 | |
| IA0318 #07 Y:2003 | 07 | 2003 | Install occupancy sensors | $203 | $532 | |
| IA0318 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $1,575 | $5,663 | |
| IA0318 #05 Y:2003 | 05 | 2003 | Utilize higher efficiency lamps and/or ballasts | $1,933 | $1,440 |