ITAC Assessment: IA0318
ITAC logo
ITAC Assessment: IA0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product pressure sensitive labels
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 155,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,488 6,197,100
kWh
Electricity Demand $128,772 12,924
kW-mo/yr
Natural Gas $15,095 2,849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $572 $69 $332
14,226
kWh
$240
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $701 $25 $409
17,472
kWh
$292
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $4,583 $3,100 $2,673
114,192
kWh
$1,910
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $370 $202 $216
9,229
kWh
$154
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,933 $1,440 $1,127
48,167
kWh
$806
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,575 $5,663 $918
39,237
kWh
$657
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $203 $532 $203
8,715
kWh
- -
08 3.5217: Reuse / recycle/ sell paper products $43,920 $320 - - $43,920
-
lb
TOTAL RECOMMENDED $53,857 $11,351 $5,878
251,238
kWh
$4,059
-
kW-mo/yr
$43,920
-
lb
TOTAL IMPLEMENTED $2,875 $1,711 $1,675
71,622
kWh
$1,200
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs