Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,047

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0016 #05 Y:2023 Use most efficient type of electric motors $13,733 $6,270
CI0016 #04 Y:2023 Recover waste heat from equipment $28,538 $5,000
CI0016 #03 Y:2023 Recover waste heat from equipment $36,111 $6,000
CI0016 #02 Y:2023 Recover waste heat from equipment $49,228 $6,000
CI0016 #01 Y:2023 Use solar heat to make electricty $175,385 $609,600
ORC009 #05 Y:2023 Install occupancy sensors $307 $200
ORC009 #04 Y:2023 Ventilation system to shut off when room is not in use $83 $400
ORC009 #03 Y:2023 Install vinyl strip / high speed / air curtain doors $178 $500
ORC009 #02 Y:2023 Replace boiler $1,624 $10,000
ORC009 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $654 $2,000
NT0007 #05 Y:2023 Change procedures / equipment / operating conditions $12,000 $7,500
NT0007 #04 Y:2023 Optimize plant power factor $4,290 $5,486
NT0007 #03 Y:2023 Change procedures / equipment / operating conditions $22,470 -
NT0007 #02 Y:2023 Replace existing hvac unit with high efficiency model $63,856 $337,512
NT0007 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $6,184 $5,993
OK1090 #05 Y:2023 Use solar heat to make electricty $68,844 $438,000
OK1090 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,316 $3,638
OK1090 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,602 $1,797
OK1090 #02 Y:2023 Clean and maintain refrigerant condensers and towers $172 $530
OK1090 #01 Y:2023 Use counter current rinsing to reduce waste water $76,727 $51,456