Assessment Year | 2023 |
---|---|
Principal Product | Electric component manufacturing |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
44,455
ft2
|
Annual Production | 720,000
pieces
|
Production Hrs. Annual | 5,040
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $144,985 | 1,648,500 |
kWh
|
$0.088 | |
Electricity Demand | $46,821 | 4,290 |
kW-mo/yr
|
$10.91 | |
Electricity Fees | $13,965 | - |
|
- | |
Natural Gas | $8,397 | 746 |
MMBtu
|
$11.26 | |
Waste Disposal Costs | |||||
Water Usage | $9,469 | 589 |
Tgal
|
$16.08 | |
TOTAL YEARLY COSTS | $223,638 | ||||
RECOMMENDED SAVINGS* | $108,800 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,184 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,184 | $5,993 |
$4,773
54,298
kWh
|
$1,411
-
kW-mo/yr
|
- | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $63,856 | $337,512 |
$63,856
726,467
kWh
|
- | - | |
03 | 3.1191: Change procedures / equipment / operating conditions | $22,470 | - | - | - | $22,470 | |
04 | 2.3212: Optimize plant power factor | $4,290 | $5,486 | - |
$4,290
-
kW-mo/yr
|
- | |
05 | 3.1191: Change procedures / equipment / operating conditions | $12,000 | $7,500 | - | - | $12,000 | |
TOTAL RECOMMENDED | $108,800 | $356,491 |
$68,629
780,764
kWh
|
$5,701
-
kW-mo/yr
|
$34,470 | ||
TOTAL IMPLEMENTED | $6,184 | $5,993 |
$4,773
54,298
kWh
|
$1,411
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs