ITAC Assessment: NT0007
ITAC logo
ITAC Assessment: NT0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Electric component manufacturing
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 44,455
ft2
Annual Production 720,000
pieces
Production Hrs. Annual 5,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,985 1,648,500
kWh
Electricity Demand $46,821 4,290
kW-mo/yr
Electricity Fees $13,965 -
Natural Gas $8,397 746
MMBtu
Waste Disposal Costs
Water Usage $9,469 589
Tgal
TOTAL YEARLY COSTS $223,638
RECOMMENDED SAVINGS* $108,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,184 $5,993 $4,773
54,298
kWh
$1,411
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $63,856 $337,512 $63,856
726,467
kWh
- -
03 3.1191: Change procedures / equipment / operating conditions $22,470 - - - $22,470
04 2.3212: Optimize plant power factor $4,290 $5,486 - $4,290
-
kW-mo/yr
-
05 3.1191: Change procedures / equipment / operating conditions $12,000 $7,500 - - $12,000
TOTAL RECOMMENDED $108,800 $356,491 $68,629
780,764
kWh
$5,701
-
kW-mo/yr
$34,470
TOTAL IMPLEMENTED $6,184 $5,993 $4,773
54,298
kWh
$1,411
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs