ITAC Assessment: TN0175
ITAC logo
ITAC Assessment: TN0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product HEAT TRANSFER EQUIPMENT
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,054 1,197,245
kWh
Natural Gas $60,805 11,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $11,000 $53,000 - $11,000
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,977 $4,000 $8,977
137,749
kWh
-
03 2.6232: Install set-back timers $520 - $520
8,792
kWh
-
TOTAL RECOMMENDED $20,497 $57,000 $9,497
146,541
kWh
$11,000
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs