ITAC Assessment: SD0112
ITAC logo
ITAC Assessment: SD0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 36,200
thousand feet
Production Hrs. Annual 6,552
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,982 1,190,797
kWh
Natural Gas $2,772 389
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,149 $450 $1,149
9,965
kWh
- -
02 2.2514: Cover open tanks $1,015 $250 $1,015
8,792
kWh
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $1,144 $1,600 $1,144
4,689
kWh
- -
04 2.2511: Insulate bare equipment $2,282 $563 $2,282
19,637
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,168 $6,733 $3,168
27,257
kWh
- -
06 2.7144: Install spectral reflectors / delamp $5,047 $4,305 $5,047
41,032
kWh
- -
07 2.7135: Install occupancy sensors $494 $599 $494
4,103
kWh
- -
08 2.7261: Install timers and/or thermostats $1,306 $849 $1,306
11,137
kWh
- -
09 3.1244: Reduce solution drag-out to prevent solution loss $730 $250 - $730
-
gal
-
10 3.5314: Use in-process recycling whenever possible $2,184 - - - $2,184
-
lb
11 3.1152: Use high quality scrap (low sulfur) to reduce hazardous sludge generation $1,069 $1,000 - $1,069
-
gal
-
TOTAL RECOMMENDED $19,588 $16,599 $15,605
126,612
kWh
$1,799
-
gal
$2,184
-
lb
TOTAL IMPLEMENTED $16,910 $16,000 $15,111
122,509
kWh
$1,799
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs