ITAC Assessment: MA0791
ITAC logo
ITAC Assessment: MA0791
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 100,000
ft2
Annual Production 4,200,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,465 5,188,000
kWh
Electricity Demand $163,176 10,848
kW-mo/yr
Electricity Fees $9,120 -
Natural Gas $146,046 22,803
MMBtu
TOTAL YEARLY COSTS $794,807
RECOMMENDED SAVINGS* $93,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $74,318 $264,000 $67,565
734,400
kWh
$28,159
-
kW-mo/yr
$(-21,406.0)
-
MMBtu
02 2.1114: Limit and control secondary combustion air in furnace $16,275 $1,000 - - $16,275
-
MMBtu
03 2.2511: Insulate bare equipment $1,313 $238 - - $1,313
-
MMBtu
04 2.1231: Establish burner maintenance schedule for boilers $974 $1,000 - - $974
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $434 $200 $434
4,722
kWh
- -
TOTAL RECOMMENDED $93,314 $266,438 $67,999
739,122
kWh
$28,159
-
kW-mo/yr
$(-2,844.0)
-
MMBtu
TOTAL IMPLEMENTED $2,287 $1,238 - - $2,287
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs