Assessment Year | 2023 |
---|---|
Principal Product | Carpet |
NAICS | 314110: Carpet and Rug Mills |
SIC | 2273: Carpets and Rugs |
Sales Range | $100 M to 500M |
# of Employees | 445 |
Plant Area |
280,000
ft2
|
Annual Production | 6,000,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $432,685 | 6,330,721 |
kWh
|
$0.068 | |
Electricity Demand | $522,426 | 21,020 |
kW-mo/yr
|
$24.85 | |
Natural Gas | $165,328 | 36,180 |
MMBtu
|
$4.57 | |
Waste Disposal Costs | |||||
Water Usage | $89,890 | 10,939 |
Tgal
|
$8.22 | |
TOTAL YEARLY COSTS | $1,210,329 | ||||
RECOMMENDED SAVINGS* | $338,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $175,385 | $609,600 |
$72,490
389,057
kWh
|
$102,895
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $49,228 | $6,000 |
$46,168
247,786
kWh
|
$3,060
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $36,111 | $6,000 |
$24,181
129,780
kWh
|
$11,930
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $28,538 | $5,000 |
$28,444
152,661
kWh
|
$94
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $13,733 | $6,270 |
$12,012
64,579
kWh
|
$1,721
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,065 | $1,500 |
$9,940
53,347
kWh
|
$2,125
-
kW-mo/yr
|
- | |
07 | 2.1224: Replace boiler | $11,941 | $45,000 |
$(-13,022.0)
(-69,888)
kWh
|
$(-3,340.0)
-
kW-mo/yr
|
$28,303
-
MMBtu
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,511 | - |
$8,994
48,272
kWh
|
$2,517
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $338,512 | $679,370 |
$189,207
1,015,594
kWh
|
$121,002
-
kW-mo/yr
|
$28,303
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs