ITAC Assessment: CO0055
ITAC logo
ITAC Assessment: CO0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MEAT SNACKS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 4,300,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,678 2,094,080
kWh
Natural Gas $67,919 14,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $2,355 - $2,355
36,635
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,336 $300 - $1,336
-
MMBtu
03 2.2437: Recover waste heat from equipment $2,244 $600 - $2,244
-
MMBtu
04 2.2437: Recover waste heat from equipment $1,716 $400 - $1,716
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $417 $150 $417
6,448
kWh
-
06 2.7221: Lower temperature during the winter season and vice-versa $533 $300 - $533
-
MMBtu
07 2.7444: Close holes and openings in building such as broken windows $1,802 $200 - $1,802
-
MMBtu
08 2.7492: Use proper thickness of insulation on building envelope $242 $400 - $242
-
MMBtu
09 2.7421: Reduce glazed areas in buildings $76 $75 - $76
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,539 $1,293 $2,539
39,566
kWh
-
TOTAL RECOMMENDED $13,260 $3,718 $5,311
82,649
kWh
$7,949
-
MMBtu
TOTAL IMPLEMENTED $11,468 $3,243 $5,311
82,649
kWh
$6,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs