ITAC Assessment: NC0586
ITAC logo
ITAC Assessment: NC0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Fresh herbs
NAICS 311942: Spice and Extract Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 340,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $252,742 4,764,630
kWh
Electricity Demand $100,768 24,121
kW-mo/yr
Electricity Fees $2,189 -
LPG $261,368 26,948
MMBtu
TOTAL YEARLY COSTS $617,067
RECOMMENDED SAVINGS* $947,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $947,122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,081 $2,500 - $3,081
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $308 $200 $277
5,424
kWh
$31
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $988 $2,500 $885
17,318
kWh
$103
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,873 $9,000 $7,593
148,587
kWh
$886
-
kW-mo/yr
$1,394 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $929,030 $400,000 $27,496
538,083
kWh
- $21,534 $880,000
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,008 $2,890 $872
17,069
kWh
- $136 -
07 2.4151: Develop a repair/replace policy $2,834 $4,685 $2,552
49,940
kWh
$282
-
kW-mo/yr
- -
TOTAL RECOMMENDED $947,122 $421,775 $39,675
776,421
kWh
$4,383
-
kW-mo/yr
$23,064 $880,000
TOTAL IMPLEMENTED $947,122 $421,775 $39,675
776,421
kWh
$4,383
-
kW-mo/yr
$23,064 $880,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs