ITAC Assessment: OK1090
ITAC logo
ITAC Assessment: OK1090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product processed wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 5
Plant Area 350,000
ft2
Annual Production 1,095,000
Tgal
Production Hrs. Annual 2,912
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $452,471 5,306,000
kWh
Waste Disposal Costs
Water Usage $96,141 27,468
Tgal
TOTAL YEARLY COSTS $548,612
RECOMMENDED SAVINGS* $150,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,817

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Consumption Savings
01 3.4153: Use counter current rinsing to reduce waste water $76,727 $51,456 - $76,727
-
Tgal
02 2.7211: Clean and maintain refrigerant condensers and towers $172 $530 $172
2,012
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,602 $1,797 $3,602
42,376
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,316 $3,638 $1,316
15,477
kWh
-
05 2.9114: Use solar heat to make electricty $68,844 $438,000 $68,844
809,928
kWh
-
TOTAL RECOMMENDED $150,661 $495,421 $73,934
869,793
kWh
$76,727
-
Tgal
TOTAL IMPLEMENTED $81,817 $57,421 $5,090
59,865
kWh
$76,727
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs