6,630
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NV0059 #05 Y:1996 | 05 | 1996 | Use a less expensive method of waste removal | $2,340 | - | n/a |
| NV0059 #04 Y:1996 | 04 | 1996 | Upgrade obsolete equipment | $11,766 | $33,000 | n/a |
| NV0059 #03 Y:1996 | 03 | 1996 | Install occupancy sensors | $511 | $56 | n/a |
| NV0059 #02 Y:1996 | 02 | 1996 | Install spectral reflectors / delamp | $814 | $60 | n/a |
| NV0059 #01 Y:1996 | 01 | 1996 | Replace electrically-operated equipment with fossil fuel equipment | $2,658 | $2,000 | n/a |
| NC0100 #09 Y:1996 | 09 | 1996 | Contract a wood pallet recycling company | $150 | $100 | |
| NC0100 #08 Y:1996 | 08 | 1996 | Recover and reuse waste material | $17,000 | $850 | |
| NC0100 #07 Y:1996 | 07 | 1996 | Utilize higher efficiency lamps and/or ballasts | $1,271 | $5,040 | |
| NC0100 #06 Y:1996 | 06 | 1996 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,547 | - | |
| NC0100 #05 Y:1996 | 05 | 1996 | Use photocell controls | $3,024 | $440 | |
| NC0100 #04 Y:1996 | 04 | 1996 | Reduce illumination to minimum necessary levels | $3,991 | $3,200 | |
| NC0100 #03 Y:1996 | 03 | 1996 | Use most efficient type of electric motors | $2,693 | $1,795 | |
| NC0100 #02 Y:1996 | 02 | 1996 | Reschedule plant operations or reduce load to avoid peaks | $260,000 | - | |
| NC0100 #01 Y:1996 | 01 | 1996 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $307,788 | $815,000 | |
| MS0064 #07 Y:1996 | 07 | 1996 | Use re-usable filters | $1,373 | $1,440 | |
| MS0064 #06 Y:1996 | 06 | 1996 | Recover and reuse waste material | $800 | $1,000 | |
| MS0064 #05 Y:1996 | 05 | 1996 | Utilize controls to operate equipment only when needed | $1,928 | $320 | |
| MS0064 #04 Y:1996 | 04 | 1996 | Install timers and/or thermostats | $1,386 | $3,248 | |
| MS0064 #03 Y:1996 | 03 | 1996 | Utilize higher efficiency lamps and/or ballasts | $12,999 | $35,867 | |
| MS0064 #02 Y:1996 | 02 | 1996 | Recover waste heat from equipment | $12,252 | $7,353 |