| Assessment Year | 1996 |
|---|---|
| Principal Product | Metal Hardware |
| NAICS |
n/a
|
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 264 |
| Plant Area |
281,500
ft2
|
| Annual Production | 10,240,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $150,430 | 3,539,566 |
kWh
|
$0.042 |
| Electricity Demand | $62,785 | 10,502 |
kW-mo/yr
|
$5.98 |
| Electricity Fees | $14,335 | - |
|
- |
| Natural Gas | $140,470 | 35,189 |
MMBtu
|
$3.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,251 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7134: Use photocell controls | $7,748 | $1,675 |
$7,748
182,298
kWh
|
- | - | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $12,252 | $7,353 | - | - |
$12,252
-
MMBtu
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,999 | $35,867 |
$8,337
198,417
kWh
|
$4,662
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7261: Install timers and/or thermostats | $1,386 | $3,248 |
$1,386
32,532
kWh
|
- | - | - | - | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $1,928 | $320 |
$1,928
45,428
kWh
|
- | - | - | - | |
| 06 | 3.5311: Recover and reuse waste material | $800 | $1,000 | - | - | - |
$800
-
lb
|
- | |
| 07 | 3.7196: Use re-usable filters | $1,373 | $1,440 | - | - | - | - | $1,373 | |
| TOTAL RECOMMENDED | $38,486 | $50,903 |
$19,399
458,675
kWh
|
$4,662
-
kW-mo/yr
|
$12,252
-
MMBtu
|
$800
-
lb
|
$1,373 | ||
| TOTAL IMPLEMENTED | $25,251 | $43,220 |
$8,337
198,417
kWh
|
$4,662
-
kW-mo/yr
|
$12,252
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs