*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Meat Snacks
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 14,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,720 486,572
kWh
Electricity Demand $24,525 1,497
kW-mo/yr
Electricity Fees $13,869 -
Natural Gas $54,188 5,177
MMBtu
Other Gas $15,268 1
MMBtu
Waste Disposal Costs
Water Usage $8,130 616
Tgal
Water Disposal $4,498 616
Tgal
TOTAL YEARLY COSTS $201,198
RECOMMENDED SAVINGS* $105,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $43,028 $180,000 $21,968
132,416
kWh
- - $21,060 -
02 2.4323: Use optimum size and capacity equipment $15,529 $100,000 - - $2,029
-
MMBtu
- $13,500
03 2.9114: Use solar heat to make electricty $13,426 $93,790 $11,362
68,486
kWh
$2,064
-
kW-mo/yr
- - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $10,940 $13,970 $10,940
65,942
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,848 $9,000 $5,638
33,982
kWh
$3,210
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $5,585 $8,530 - - $5,585
-
MMBtu
- -
07 2.4226: Use / purchase optimum sized compressor $5,415 $5,000 $3,449
20,791
kWh
$1,966
-
kW-mo/yr
- - -
08 2.3132: Recharge batteries on during off-peak demand periods $2,241 $1,500 - $2,241
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $105,012 $411,790 $53,357
321,617
kWh
$9,481
-
kW-mo/yr
$7,614
-
MMBtu
$21,060 $13,500
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs