ITAC Assessment: NV0059
ITAC logo
ITAC Assessment: NV0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic Signs
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 30,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,715 207,796
kWh
Electricity Demand $19,776 3,883
kW-mo/yr
Electricity Fees $1,400 -
Natural Gas $1,321 207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,658 $2,000 n/a - - - $2,658
02 2.7144: Install spectral reflectors / delamp $814 $60 n/a $545
11,723
kWh
$269
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $511 $56 n/a $357
5,569
kWh
$154
-
kW-mo/yr
- -
04 2.4321: Upgrade obsolete equipment $11,766 $33,000 n/a $11,766
72,098
kWh
- - -
05 3.6192: Use a less expensive method of waste removal $2,340 - n/a - - $2,340 -
TOTAL RECOMMENDED $18,089 $35,116 $12,668
89,390
kWh
$423
-
kW-mo/yr
$2,340 $2,658
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs