Assessment Year | 1996 |
---|---|
Principal Product | Lumber |
NAICS |
n/a
|
SIC | 2420: |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
100,000
ft2
|
Annual Production | 154,000,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $742,175 | 20,795,428 |
kWh
|
$0.036 |
Electricity Demand | $756,557 | 46,072 |
kW-mo/yr
|
$16.42 |
Electricity Fees | $180,027 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $599,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $279,843 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $307,788 | $815,000 |
$142,800
4,000,000
kWh
|
$249,600
-
kW-mo/yr
|
- | $(-30,000.0) | $(-54,612.0) | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $260,000 | - | - |
$260,000
-
kW-mo/yr
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $2,693 | $1,795 |
$980
27,550
kWh
|
$1,713
-
kW-mo/yr
|
- | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $3,991 | $3,200 |
$1,453
40,739
kWh
|
$2,538
-
kW-mo/yr
|
- | - | - | |
05 | 2.7134: Use photocell controls | $3,024 | $440 |
$1,150
39,273
kWh
|
$1,874
-
kW-mo/yr
|
- | - | - | |
06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,547 | - |
$3,547
99,355
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,271 | $5,040 |
$507
14,068
kWh
|
$404
-
kW-mo/yr
|
- | - | $360 | |
08 | 3.5311: Recover and reuse waste material | $17,000 | $850 | - | - |
$20,750
-
lb
|
$(-3,750.0) | - | |
09 | 3.5316: Contract a wood pallet recycling company | $150 | $100 | - | - |
$150
-
lb
|
- | - | |
TOTAL RECOMMENDED | $599,464 | $826,425 |
$150,437
4,220,985
kWh
|
$516,129
-
kW-mo/yr
|
$20,900
-
lb
|
$(-33,750.0) | $(-54,252.0) | ||
TOTAL IMPLEMENTED | $279,843 | $2,745 |
$980
27,550
kWh
|
$261,713
-
kW-mo/yr
|
$20,900
-
lb
|
$(-3,750.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs