| Assessment Year | 1996 |
|---|---|
| Principal Product | Lumber |
| NAICS |
n/a
|
| SIC | 2420: |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
100,000
ft2
|
| Annual Production | 154,000,000
thousand feet
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $742,175 | 20,795,428 |
kWh
|
$0.036 |
| Electricity Demand | $756,557 | 46,072 |
kW-mo/yr
|
$16.42 |
| Electricity Fees | $180,027 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $599,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $279,843 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $307,788 | $815,000 |
$142,800
4,000,000
kWh
|
$249,600
-
kW-mo/yr
|
- | $(-30,000.0) | $(-54,612.0) | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $260,000 | - | - |
$260,000
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $2,693 | $1,795 |
$980
27,550
kWh
|
$1,713
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $3,991 | $3,200 |
$1,453
40,739
kWh
|
$2,538
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7134: Use photocell controls | $3,024 | $440 |
$1,150
39,273
kWh
|
$1,874
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,547 | - |
$3,547
99,355
kWh
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,271 | $5,040 |
$507
14,068
kWh
|
$404
-
kW-mo/yr
|
- | - | $360 | |
| 08 | 3.5311: Recover and reuse waste material | $17,000 | $850 | - | - |
$20,750
-
lb
|
$(-3,750.0) | - | |
| 09 | 3.5316: Contract a wood pallet recycling company | $150 | $100 | - | - |
$150
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $599,464 | $826,425 |
$150,437
4,220,985
kWh
|
$516,129
-
kW-mo/yr
|
$20,900
-
lb
|
$(-33,750.0) | $(-54,252.0) | ||
| TOTAL IMPLEMENTED | $279,843 | $2,745 |
$980
27,550
kWh
|
$261,713
-
kW-mo/yr
|
$20,900
-
lb
|
$(-3,750.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs