ITAC Assessment: UL2408
ITAC logo
ITAC Assessment: UL2408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aluminum
NAICS 331315: Aluminum Sheet, Plate, and Foil Manufacturing
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range less than $500
k
# of Employees 300
Plant Area 500,000
ft2
Annual Production 250,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,678,019 32,321,365
kWh
Electricity Demand $1,011,930 86,938
kW-mo/yr
Electricity Fees $(-498,851.0) -
Natural Gas $549,137 96,276
MMBtu
TOTAL YEARLY COSTS $2,740,235
RECOMMENDED SAVINGS* $438,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2692: Use outside cold water source as a supply of cooling water $77,905 $42,617 $56,738
1,091,109
kWh
$21,167
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $319,482 $2,990,386 $229,169
4,407,094
kWh
$90,313
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $40,749 $39,000 - - $40,749
-
MMBtu
TOTAL RECOMMENDED $438,136 $3,072,003 $285,907
5,498,203
kWh
$111,480
-
kW-mo/yr
$40,749
-
MMBtu
TOTAL IMPLEMENTED - - - - -