Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,484

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AR0140 #03 Y:1998 Install compressor air intakes in coolest locations $2,420 $130
AR0140 #02 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $1,967 $250
AR0140 #01 Y:1998 Optimize plant power factor $33,786 $22,860
WI0327 #08 Y:1998 Disconnect ballasts $487 -
WI0327 #07 Y:1998 Reduce illumination to minimum necessary levels $701 -
WI0327 #06 Y:1998 Install vinyl strip / high speed / air curtain doors $1,573 $590
WI0327 #05 Y:1998 Use a less expensive method of waste removal $528 $800
WI0327 #04 Y:1998 Install equipment (eg compactor) to reduce disposal costs $3,266 $9,500
WI0327 #03 Y:1998 Install occupancy sensors $4,466 $7,200
WI0327 #02 Y:1998 Utilize controls to operate equipment only when needed $7,343 -
WI0327 #01 Y:1998 Optimize production lot sizes and inventories $13,100 -
SF0144 #11 Y:1998 Replace existing equipment with more suitable substitutes $86,019 $300,440
SF0144 #10 Y:1998 Replace existing equipment with more suitable substitutes $105,533 $72,440
SF0144 #09 Y:1998 Modify current incentive program $27,108 $1,200
SF0144 #08 Y:1998 Add additional production shift $14,820 -
SF0144 #07 Y:1998 Lease / purchase baler; sell cardboard to recycler $2,556 $300
SF0144 #06 Y:1998 Separate and recycle scrap metal to foundry or for sale $32,308 $300
SF0144 #05 Y:1998 Lease / purchase baler; sell cardboard to recycler $1,768 -
SF0144 #04 Y:1998 Utilize higher efficiency lamps and/or ballasts $4,807 $13,260
SF0144 #03 Y:1998 Utilize higher efficiency lamps and/or ballasts $2,624 $9,930