ITAC Assessment: SF0144
ITAC logo
ITAC Assessment: SF0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Stoves
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 65,000
ft2
Annual Production 5,500
pieces
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,453 782,825
kWh
Electricity Demand $14,162 3,312
kW-mo/yr
Natural Gas $11,984 2,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $278,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $731 $22 $651
7,913
kWh
$80
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $328 $430 $261
3,224
kWh
$67
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,624 $9,930 $2,107
26,084
kWh
$517
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,807 $13,260 $3,824
47,186
kWh
$983
-
kW-mo/yr
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,768 - - - $1,768
-
lb
-
06 3.5248: Separate and recycle scrap metal to foundry or for sale $32,308 $300 - - $32,308
-
lb
-
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,556 $300 - - $2,556
-
lb
-
08 4.451: Add additional production shift $14,820 - - - - $14,820
09 4.421: Modify current incentive program $27,108 $1,200 - - - $27,108
10 4.652: Replace existing equipment with more suitable substitutes $105,533 $72,440 - - - $105,533
11 4.652: Replace existing equipment with more suitable substitutes $86,019 $300,440 - - - $86,019
TOTAL RECOMMENDED $278,602 $398,322 $6,843
84,407
kWh
$1,647
-
kW-mo/yr
$36,632
-
lb
$233,480
TOTAL IMPLEMENTED $37,691 $1,052 $912
11,137
kWh
$147
-
kW-mo/yr
$36,632
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs