Assessment Year | 1998 |
---|---|
Principal Product | Stoves |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
65,000
ft2
|
Annual Production | 5,500
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,453 | 782,825 |
kWh
|
$0.081 |
Electricity Demand | $14,162 | 3,312 |
kW-mo/yr
|
$4.28 |
Natural Gas | $11,984 | 2,289 |
MMBtu
|
$5.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $278,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,691 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $731 | $22 |
$651
7,913
kWh
|
$80
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $328 | $430 |
$261
3,224
kWh
|
$67
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,624 | $9,930 |
$2,107
26,084
kWh
|
$517
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,807 | $13,260 |
$3,824
47,186
kWh
|
$983
-
kW-mo/yr
|
- | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,768 | - | - | - |
$1,768
-
lb
|
- | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $32,308 | $300 | - | - |
$32,308
-
lb
|
- | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,556 | $300 | - | - |
$2,556
-
lb
|
- | |
08 | 4.451: Add additional production shift | $14,820 | - | - | - | - | $14,820 | |
09 | 4.421: Modify current incentive program | $27,108 | $1,200 | - | - | - | $27,108 | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $105,533 | $72,440 | - | - | - | $105,533 | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $86,019 | $300,440 | - | - | - | $86,019 | |
TOTAL RECOMMENDED | $278,602 | $398,322 |
$6,843
84,407
kWh
|
$1,647
-
kW-mo/yr
|
$36,632
-
lb
|
$233,480 | ||
TOTAL IMPLEMENTED | $37,691 | $1,052 |
$912
11,137
kWh
|
$147
-
kW-mo/yr
|
$36,632
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs