ITAC Assessment: CO0208
ITAC logo
ITAC Assessment: CO0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product RESISTORS
NAICS
n/a
SIC 3676: Electronic Resistors
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,108
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,637 2,670,281
kWh
Natural Gas $7,113 1,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,979

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,981 $1,608 $2,981
57,151
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $2,800 $10,000 $2,800
101,993
kWh
-
03 2.4133: Use most efficient type of electric motors $300 $892 $300
5,862
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $458 $1,300 $458
8,792
kWh
-
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,100 $200 $1,100
21,102
kWh
-
06 2.7261: Install timers and/or thermostats $800 $1,500 $585
21,395
kWh
$215
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $540 $500 $540
10,258
kWh
-
TOTAL RECOMMENDED $8,979 $16,000 $8,764
226,553
kWh
$215
-
MMBtu
TOTAL IMPLEMENTED $8,979 $16,000 $8,764
226,553
kWh
$215
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs