4,652
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0362 #07 Y:2005 | 07 | 2005 | Add area lighting switches | $357 | $3,655 | |
| UF0362 #06 Y:2005 | 06 | 2005 | Utilize higher efficiency lamps and/or ballasts | $8,793 | $16,078 | |
| UF0362 #05 Y:2005 | 05 | 2005 | Use most efficient type of electric motors | $245 | $324 | |
| UF0362 #04 Y:2005 | 04 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $767 | - | |
| UF0362 #03 Y:2005 | 03 | 2005 | Lower temperature during the winter season and vice-versa | $14,498 | - | |
| UF0362 #02 Y:2005 | 02 | 2005 | Install occupancy sensors | $5,310 | $2,525 | |
| UF0362 #01 Y:2005 | 01 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,108 | $706 | |
| OR0484 #03 Y:2005 | 03 | 2005 | Use most efficient type of electric motors | $847 | $1,013 | |
| OR0484 #02 Y:2005 | 02 | 2005 | Analyze flue gas for proper air/fuel ratio | $2,710 | $400 | |
| OR0484 #01 Y:2005 | 01 | 2005 | Use radiant heater for spot heating | $41,089 | $40,143 | |
| LM0100 #06 Y:2005 | 06 | 2005 | Install shelves / racks to utilize unused space | $54,000 | $332,000 |
n/a
|
| LM0100 #05 Y:2005 | 05 | 2005 | Replace existing equipment with more suitable substitutes | $5,000 | $9,000 |
n/a
|
| LM0100 #04 Y:2005 | 04 | 2005 | Use solar heat to make electricty | $7,424 | $200,000 |
n/a
|
| LM0100 #03 Y:2005 | 03 | 2005 | Reduce illumination to minimum necessary levels | $3,133 | $200 |
n/a
|
| LM0100 #02 Y:2005 | 02 | 2005 | Insulate bare equipment | $11,036 | $21,600 |
n/a
|
| LM0100 #01 Y:2005 | 01 | 2005 | Use most efficient type of electric motors | $820 | $6,493 |
n/a
|
| OR0483 #07 Y:2005 | 07 | 2005 | Use heat exchange fluids instead of steam in pipeline tracing systems | $5,131 | $15,000 | |
| OR0483 #06 Y:2005 | 06 | 2005 | Re-arrange equipment layout to reduce labor costs | $40,390 | $72,000 | |
| OR0483 #05 Y:2005 | 05 | 2005 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $41,000 | $69,000 | |
| OR0483 #04 Y:2005 | 04 | 2005 | Re-arrange equipment layout to reduce handling costs | $8,960 | $3,000 |