Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,652

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0362 #07 Y:2005 Add area lighting switches $357 $3,655
UF0362 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $8,793 $16,078
UF0362 #05 Y:2005 Use most efficient type of electric motors $245 $324
UF0362 #04 Y:2005 Utilize energy-efficient belts and other improved mechanisms $767 -
UF0362 #03 Y:2005 Lower temperature during the winter season and vice-versa $14,498 -
UF0362 #02 Y:2005 Install occupancy sensors $5,310 $2,525
UF0362 #01 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $11,108 $706
OR0484 #03 Y:2005 Use most efficient type of electric motors $847 $1,013
OR0484 #02 Y:2005 Analyze flue gas for proper air/fuel ratio $2,710 $400
OR0484 #01 Y:2005 Use radiant heater for spot heating $41,089 $40,143
LM0100 #06 Y:2005 Install shelves / racks to utilize unused space $54,000 $332,000
LM0100 #05 Y:2005 Replace existing equipment with more suitable substitutes $5,000 $9,000
LM0100 #04 Y:2005 Use solar heat to make electricty $7,424 $200,000
LM0100 #03 Y:2005 Reduce illumination to minimum necessary levels $3,133 $200
LM0100 #02 Y:2005 Insulate bare equipment $11,036 $21,600
LM0100 #01 Y:2005 Use most efficient type of electric motors $820 $6,493
OR0483 #07 Y:2005 Use heat exchange fluids instead of steam in pipeline tracing systems $5,131 $15,000
OR0483 #06 Y:2005 Re-arrange equipment layout to reduce labor costs $40,390 $72,000
OR0483 #05 Y:2005 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $41,000 $69,000
OR0483 #04 Y:2005 Re-arrange equipment layout to reduce handling costs $8,960 $3,000