| Assessment Year | 2005 |
|---|---|
| Principal Product | Coffee Syrups & Sauces |
| NAICS | 311920: Coffee and Tea Manufacturing |
| SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
65,000
ft2
|
| Annual Production | 4,500,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,990 | 1,066,960 |
kWh
|
$0.058 |
| Electricity Demand | $3,909 | 3,795 |
kW-mo/yr
|
$1.03 |
| Electricity Fees | $1,282 | - |
|
- |
| Natural Gas | $59,021 | 6,916 |
MMBtu
|
$8.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $162,695 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $157,564 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.5311: Recover and reuse waste material | $21,624 | - | - | - | - | $21,624 | |
| 02 | 2.1213: Direct warmest air to combustion intake | $24,290 | $4,400 |
$590
9,300
kWh
|
$1,300
-
MMBtu
|
- | $22,400 | |
| 03 | 3.4116: Meter recycled water (to reduce sewer charges) | $21,300 | $5,100 | - | - | - | $21,300 | |
| 04 | 4.514: Re-arrange equipment layout to reduce handling costs | $8,960 | $3,000 | - | - | - | $8,960 | |
| 05 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $41,000 | $69,000 | - | - | - | $41,000 | |
| 06 | 4.513: Re-arrange equipment layout to reduce labor costs | $40,390 | $72,000 | - | - |
$2,590
-
MMBtu
|
$37,800 | |
| 07 | 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems | $5,131 | $15,000 | - |
$5,131
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $162,695 | $168,500 |
$590
9,300
kWh
|
$6,431
-
MMBtu
|
$2,590
-
MMBtu
|
$153,084 | ||
| TOTAL IMPLEMENTED | $157,564 | $153,500 |
$590
9,300
kWh
|
$1,300
-
MMBtu
|
$2,590
-
MMBtu
|
$153,084 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs