Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,368

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0087 #05 Y:1993 Use most efficient type of electric motors $905 $4,520
MO0087 #04 Y:1993 Utilize higher efficiency lamps and/or ballasts $750 $385
MO0087 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $885 $5,143
MO0087 #02 Y:1993 Use synthetic lubricant $1,117 $650
MO0087 #01 Y:1993 Install compressor air intakes in coolest locations $1,143 $1,605
WV0005 #07 Y:1993 Close holes and openings in building such as broken windows $4,213 $3,542
WV0005 #06 Y:1993 Utilize higher efficiency lamps and/or ballasts $7,008 $2,485
WV0005 #05 Y:1993 Use most efficient type of electric motors $1,833 $41,350
WV0005 #04 Y:1993 Use waste heat from flue gases to heat space conditioning air $36,648 $7,690
WV0005 #03 Y:1993 Install vinyl strip / high speed / air curtain doors $16,651 $1,600
WV0005 #02 Y:1993 Reduce the pressure of compressed air to the minimum required $1,989 $20
WV0005 #01 Y:1993 Install compressor air intakes in coolest locations $490 $160
MA0272 #08 Y:1993 Install / repair insulation on condensate lines $31 $67
MA0272 #07 Y:1993 Insulate bare equipment $6,765 $167
MA0272 #06 Y:1993 Analyze flue gas for proper air/fuel ratio $726 $400
MA0272 #05 Y:1993 Use adjustable frequency drive or multiple speed motors on existing system $4,077 $5,694
MA0272 #04 Y:1993 Utilize energy-efficient belts and other improved mechanisms $10,797 -
MA0272 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $13,507 $12,663
MA0272 #02 Y:1993 Eliminate or reduce compressed air usage $3,741 $68
MA0272 #01 Y:1993 Use adjustable frequency drive or multiple speed motors on existing system $27,014 $49