Assessment Year | 1993 |
---|---|
Principal Product | Squeeze tubes |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 900 |
Plant Area |
210,000
ft2
|
Annual Production | 300,000,000
pieces
|
Production Hrs. Annual | 8,376
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,303,073 | 17,054,221 |
kWh
|
$0.076 |
Natural Gas | $26,269 | 4,271 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,658 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,824 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,014 | $49 |
$27,014
353,458
kWh
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $3,741 | $68 |
$3,741
51,583
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,507 | $12,663 |
$13,507
176,729
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,797 | - |
$10,797
141,266
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,077 | $5,694 |
$4,077
53,341
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $726 | $400 | - |
$726
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $6,765 | $167 |
$6,765
88,511
kWh
|
- | |
08 | 2.2122: Install / repair insulation on condensate lines | $31 | $67 | - |
$31
-
MMBtu
|
|
TOTAL RECOMMENDED | $66,658 | $19,108 |
$65,901
864,888
kWh
|
$757
-
MMBtu
|
||
TOTAL IMPLEMENTED | $61,824 | $12,947 |
$61,824
811,547
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs