ITAC Assessment: MA0272
ITAC logo
ITAC Assessment: MA0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Squeeze tubes
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 900
Plant Area 210,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 8,376
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,303,073 17,054,221
kWh
Natural Gas $26,269 4,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,014 $49 $27,014
353,458
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $3,741 $68 $3,741
51,583
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,507 $12,663 $13,507
176,729
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,797 - $10,797
141,266
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,077 $5,694 $4,077
53,341
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $726 $400 - $726
-
MMBtu
07 2.2511: Insulate bare equipment $6,765 $167 $6,765
88,511
kWh
-
08 2.2122: Install / repair insulation on condensate lines $31 $67 - $31
-
MMBtu
TOTAL RECOMMENDED $66,658 $19,108 $65,901
864,888
kWh
$757
-
MMBtu
TOTAL IMPLEMENTED $61,824 $12,947 $61,824
811,547
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs