Assessment Year | 1985 |
---|---|
Principal Product | BINDERS |
NAICS |
n/a
|
SIC | 2782: Blankbooks, Looseleaf Binders and Devices |
Sales Range | $10 M to 50M |
# of Employees | 392 |
Plant Area |
n/a
|
Annual Production | 600,000
pieces
|
Production Hrs. Annual | 3,400
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,917 | 1,380,129 |
kWh
|
$0.10 |
Natural Gas | $6,602 | 983 |
MMBtu
|
$6.72 |
Fuel Oil #4 | $35,259 | 6,048 |
MMBtu
|
$5.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,268 | $160 |
$3,268
32,239
kWh
|
- | - | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $327 | - |
$327
3,224
kWh
|
- | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $882 | $537 | - | - |
$882
-
MMBtu
|
- | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $455 | - | - |
$455
-
MMBtu
|
- | - | |
05 | 3.4154: Eliminate leaks in water lines and valves | $2,636 | $35 | - |
$2,636
-
MMBtu
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $845 | $1,000 | - | - |
$239
-
MMBtu
|
$606 | |
07 | 2.3191: Use demand controller or load shedder | $5,218 | $1,900 |
$5,218
-
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,291 | $881 |
$17,291
170,574
kWh
|
- | - | - | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $13,999 | $625 | - | - |
$13,999
-
MMBtu
|
- | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,437 | $540 | - | - |
$1,437
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $46,358 | $5,678 |
$26,104
206,037
kWh
|
$3,091
-
MMBtu
|
$16,557
-
MMBtu
|
$606 | ||
TOTAL IMPLEMENTED | $40,813 | $3,778 |
$20,559
202,813
kWh
|
$3,091
-
MMBtu
|
$16,557
-
MMBtu
|
$606 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs