ITAC Assessment: UD0067
ITAC logo
ITAC Assessment: UD0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product LIGHT CONSTRUCTION EQUIPMENT
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,327
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,115 808,910
kWh
Natural Gas $37,269 9,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,431 $250 $1,431
24,033
kWh
-
02 2.7492: Use proper thickness of insulation on building envelope $12,896 $64,600 - $12,896
-
MMBtu
03 2.7494: Install storm windows and doors $6,999 $7,642 - $6,999
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,770 - $1,770
-
kWh
-
05 2.2711: Utilize outside air instead of conditioned air for drying $1,207 $286 $192
3,224
kWh
$1,015
-
MMBtu
TOTAL RECOMMENDED $24,303 $72,778 $3,393
27,257
kWh
$20,910
-
MMBtu
TOTAL IMPLEMENTED $24,303 $72,778 $3,393
27,257
kWh
$20,910
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs