| Assessment Year | 1982 |
|---|---|
| Principal Product | LIGHT CONSTRUCTION EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $5 M to 10M |
| # of Employees | 47 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,327
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,115 | 808,910 |
kWh
|
$0.057 |
| Natural Gas | $37,269 | 9,484 |
MMBtu
|
$3.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,303 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,431 | $250 |
$1,431
24,033
kWh
|
- | |
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $12,896 | $64,600 | - |
$12,896
-
MMBtu
|
|
| 03 | 2.7494: Install storm windows and doors | $6,999 | $7,642 | - |
$6,999
-
MMBtu
|
|
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,770 | - |
$1,770
-
kWh
|
- | |
| 05 | 2.2711: Utilize outside air instead of conditioned air for drying | $1,207 | $286 |
$192
3,224
kWh
|
$1,015
-
MMBtu
|
|
| TOTAL RECOMMENDED | $24,303 | $72,778 |
$3,393
27,257
kWh
|
$20,910
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,303 | $72,778 |
$3,393
27,257
kWh
|
$20,910
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs