ITAC Assessment: IA0181
ITAC logo
ITAC Assessment: IA0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product margarine, oils, shortening, and lard
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 125,000
ft2
Annual Production 290,000,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $278,258 9,456,624
kWh
Electricity Demand $191,644 22,428
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,102,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.441: Install automatic packing equipment $1,017,566 $350,000 - - - $568,286 - - $449,280
02 3.1191: Change procedures / equipment / operating conditions $41,865 $50,000 - - - - $41,865 - -
03 2.8113: Purchase gas directly from a contract gas supplier $31,001 $4,200 - - - - $31,001 - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $8,469 $8,400 - - - $(-468.0) $9,734 $(-797.0) -
05 2.4133: Use most efficient type of electric motors $420 $950 $177
6,155
kWh
$243
-
kW-mo/yr
- - - - -
06 4.211: Consider use / purchase of bulk materials where possible $2,337 $4,605 - - $13
-
lb
- $2,324 - -
07 2.4221: Install compressor air intakes in coolest locations $885 $200 $579
19,637
kWh
$306
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $214 $288 $122
4,103
kWh
$92
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $1,102,757 $418,643 $878
29,895
kWh
$641
-
kW-mo/yr
$13
-
lb
$567,818 $84,924 $(-797.0) $449,280
TOTAL IMPLEMENTED $74,171 $55,350 $756
25,792
kWh
$549
-
kW-mo/yr
- - $72,866 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs