ITAC Assessment: TT0338
ITAC logo
ITAC Assessment: TT0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Door Frames, Door Guides, Seat Hinges, and Belt Molding
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 275,000
ft2
Annual Production 1,642,500
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $676,950 9,241,376
kWh
Electricity Demand $1 33,174
kW-mo/yr
Natural Gas $37,400 4,744
MMBtu
Waste Disposal Costs
Water Usage $2,539 837
Tgal
Water Disposal $4,953 837
Tgal
TOTAL YEARLY COSTS $721,843
RECOMMENDED SAVINGS* $143,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6127: Maintain air filters by cleaning or replacement $792 - $792
10,817
kWh
- -
02 2.2511: Insulate bare equipment $288 $9 $288
3,937
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $14,906 $2,080 $14,906
203,489
kWh
- -
04 2.2443: Re-use or recycle hot or cold process exhaust air $10,465 $3,000 $10,465
142,867
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,830 $1,300 $3,830
52,293
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,075 $400 $984
13,428
kWh
$91
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $18,356 $7,500 $18,356
250,594
kWh
- -
08 2.6212: Turn off equipment during breaks, reduce operating time $8,176 $6,200 $8,176
111,624
kWh
- -
09 4.721: Initiate a program to acquire iso certification $26,431 $25,000 $25,047
341,931
kWh
- $1,384
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,020 $1,950 $2,020
27,576
kWh
- -
11 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,519 $5,000 $1,519
20,730
kWh
- -
12 2.2437: Recover waste heat from equipment $1,778 $6,000 - - $1,778
-
MMBtu
13 2.9114: Use solar heat to make electricty $53,467 $386,850 $53,467
729,924
kWh
- -
TOTAL RECOMMENDED $143,104 $445,289 $139,850
1,909,211
kWh
$91
-
kW-mo/yr
$3,162
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs