ITAC Assessment: WV0005
ITAC logo
ITAC Assessment: WV0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Flat Glass
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 437,436
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,144,912 30,229,485
kWh
Natural Gas $3,715,736 1,151,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $490 $160 $490
21,395
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,989 $20 $1,989
87,046
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $16,651 $1,600 - $16,651
-
MMBtu
04 2.2426: Use waste heat from flue gases to heat space conditioning air $36,648 $7,690 - $36,648
-
MMBtu
05 2.4133: Use most efficient type of electric motors $1,833 $41,350 $1,833
400,645
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,008 $2,485 $7,008
306,565
kWh
-
07 2.7444: Close holes and openings in building such as broken windows $4,213 $3,542 - $4,213
-
MMBtu
TOTAL RECOMMENDED $68,832 $56,847 $11,320
815,651
kWh
$57,512
-
MMBtu
TOTAL IMPLEMENTED $13,544 $47,537 $9,331
728,605
kWh
$4,213
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs