ITAC Assessment: MO0087
ITAC logo
ITAC Assessment: MO0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Steel Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 110,500
ft2
Annual Production 3,800,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,152 4,143,318
kWh
Natural Gas $48,149 12,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $1,143 $1,605 $1,143
19,637
kWh
02 2.4314: Use synthetic lubricant $1,117 $650 $1,117
19,343
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $885 $5,143 $885
15,240
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $750 $385 $750
12,896
kWh
05 2.4133: Use most efficient type of electric motors $905 $4,520 $905
15,533
kWh
TOTAL RECOMMENDED $4,800 $12,303 $4,800
82,649
kWh
TOTAL IMPLEMENTED $4,800 $12,303 $4,800
82,649
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs