4,368
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0086 #09 Y:1993 | 09 | 1993 | Install spectral reflectors / delamp | $1,977 | $7,011 | |
| AS0086 #08 Y:1993 | 08 | 1993 | Utilize higher efficiency lamps and/or ballasts | $379 | $1,598 | |
| AS0086 #07 Y:1993 | 07 | 1993 | Use most efficient type of electric motors | $213 | $519 | |
| AS0086 #06 Y:1993 | 06 | 1993 | Utilize energy-efficient belts and other improved mechanisms | $381 | - | |
| AS0086 #05 Y:1993 | 05 | 1993 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,155 | $1,200 | |
| AS0086 #04 Y:1993 | 04 | 1993 | Use synthetic lubricant | $2,431 | $7,164 | |
| AS0086 #03 Y:1993 | 03 | 1993 | Turn off equipment during breaks, reduce operating time | $5,461 | $1,500 | |
| AS0086 #02 Y:1993 | 02 | 1993 | Use adjustable frequency drive or multiple speed motors on existing system | $1,024 | $2,200 | |
| AS0086 #01 Y:1993 | 01 | 1993 | Insulate bare equipment | $1,799 | $992 | |
| AM0186 #06 Y:1993 | 06 | 1993 | Size electric motors for peak operating efficiency | $5,540 | $2,000 | |
| AM0186 #05 Y:1993 | 05 | 1993 | Chill water to the highest temperature possible | $7,460 | - | |
| AM0186 #04 Y:1993 | 04 | 1993 | Reschedule plant operations or reduce load to avoid peaks | $17,300 | - | |
| AM0186 #03 Y:1993 | 03 | 1993 | Optimize plant power factor | $17,400 | $68,000 | |
| AM0186 #02 Y:1993 | 02 | 1993 | Turn off equipment when not in use | $33,670 | - | |
| AM0186 #01 Y:1993 | 01 | 1993 | Replace electrically-operated equipment with fossil fuel equipment | $272,040 | $100,000 | |
| AM0185 #06 Y:1993 | 06 | 1993 | Use synthetic lubricant | $300 | - | |
| AM0185 #05 Y:1993 | 05 | 1993 | Lower light fixtures in high ceiling areas | $1,160 | $320 | |
| AM0185 #04 Y:1993 | 04 | 1993 | Turn off equipment when not in use | $1,660 | - | |
| AM0185 #03 Y:1993 | 03 | 1993 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,680 | $250 | |
| AM0185 #02 Y:1993 | 02 | 1993 | Make a practice of turning off lights when not needed | $1,750 | - |