ITAC Assessment: AM0186
ITAC logo
ITAC Assessment: AM0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product petroleum drilling drill bits
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 215,500
ft2
Annual Production 21,000
pieces
Production Hrs. Annual 5,322
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,299,446 26,932,591
kWh
Natural Gas $208,486 67,192
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $353,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $272,040 $100,000 $272,040
2,705,158
kWh
-
02 2.6218: Turn off equipment when not in use $33,670 - - $33,670
-
MMBtu
03 2.3212: Optimize plant power factor $17,400 $68,000 $17,400
-
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $17,300 - $17,300
-
kWh
-
05 2.2625: Chill water to the highest temperature possible $7,460 - $7,460
240,328
kWh
-
06 2.4131: Size electric motors for peak operating efficiency $5,540 $2,000 $5,540
178,781
kWh
-
TOTAL RECOMMENDED $353,410 $170,000 $319,740
3,124,267
kWh
$33,670
-
MMBtu
TOTAL IMPLEMENTED $41,130 - $7,460
240,328
kWh
$33,670
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs