Assessment Year | 1993 |
---|---|
Principal Product | petroleum drilling drill bits |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
215,500
ft2
|
Annual Production | 21,000
pieces
|
Production Hrs. Annual | 5,322
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,299,446 | 26,932,591 |
kWh
|
$0.048 |
Natural Gas | $208,486 | 67,192 |
MMBtu
|
$3.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $353,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,130 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $272,040 | $100,000 |
$272,040
2,705,158
kWh
|
- | |
02 | 2.6218: Turn off equipment when not in use | $33,670 | - | - |
$33,670
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $17,400 | $68,000 |
$17,400
-
kWh
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $17,300 | - |
$17,300
-
kWh
|
- | |
05 | 2.2625: Chill water to the highest temperature possible | $7,460 | - |
$7,460
240,328
kWh
|
- | |
06 | 2.4131: Size electric motors for peak operating efficiency | $5,540 | $2,000 |
$5,540
178,781
kWh
|
- | |
TOTAL RECOMMENDED | $353,410 | $170,000 |
$319,740
3,124,267
kWh
|
$33,670
-
MMBtu
|
||
TOTAL IMPLEMENTED | $41,130 | - |
$7,460
240,328
kWh
|
$33,670
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs