ITAC Assessment: AS0086
ITAC logo
ITAC Assessment: AS0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product AL AND MG CASTINGS
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 229
ton
Production Hrs. Annual 2,340
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,168 1,952,814
kWh
Natural Gas $63,178 14,251
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $1,799 $992 - $1,799
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,024 $2,200 $1,024
12,603
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $5,461 $1,500 $5,461
67,116
kWh
- -
04 2.4314: Use synthetic lubricant $2,431 $7,164 $1,094
13,482
kWh
- $1,337
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,155 $1,200 $8,155
100,234
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $381 - $381
4,689
kWh
- -
07 2.4133: Use most efficient type of electric motors $213 $519 $213
2,638
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $379 $1,598 $379
4,689
kWh
- -
09 2.7144: Install spectral reflectors / delamp $1,977 $7,011 $1,977
24,326
kWh
- -
10 2.8114: Change rate schedules or other changes in utility service $7,086 $50,250 $7,086
-
kWh
- -
TOTAL RECOMMENDED $28,906 $72,434 $25,770
229,777
kWh
$1,799
-
MMBtu
$1,337
TOTAL IMPLEMENTED $14,210 $3,219 $14,210
174,677
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs