4,204
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MI0222 #05 Y:2012 | 05 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,363 | $1,660 | |
| MI0222 #04 Y:2012 | 04 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $31,498 | $6,660 | |
| MI0222 #03 Y:2012 | 03 | 2012 | Analyze flue gas for proper air/fuel ratio | $38,910 | $2,520 | |
| MI0222 #02 Y:2012 | 02 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $44,472 | $19,980 | |
| MI0222 #01 Y:2012 | 01 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $94,284 | $46,620 | |
| WM0001 #08 Y:2012 | 08 | 2012 | Utilize higher efficiency lamps and/or ballasts | $3,227 | $1,535 | |
| WM0001 #07 Y:2012 | 07 | 2012 | Utilize higher efficiency lamps and/or ballasts | $141 | $1,000 | |
| WM0001 #06 Y:2012 | 06 | 2012 | Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $236 | $79 | |
| WM0001 #05 Y:2012 | 05 | 2012 | Install equipment (eg compactor) to reduce disposal costs | $27,100 | $78,000 | |
| WM0001 #04 Y:2012 | 04 | 2012 | Turn off equipment when not in use | $2,696 | - | |
| WM0001 #03 Y:2012 | 03 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $488 | - | |
| WM0001 #02 Y:2012 | 02 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $362 | $30 | |
| WM0001 #01 Y:2012 | 01 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $435 | $200 | |
| UD0855 #09 Y:2012 | 09 | 2012 | Use solar heat to make electricty | $30,362 | $106,738 | |
| UD0855 #08 Y:2012 | 08 | 2012 | Reduce ventilation air | $2,956 | $6,600 | |
| UD0855 #07 Y:2012 | 07 | 2012 | Eliminate or reduce compressed air usage | $1,886 | $10,493 | |
| UD0855 #06 Y:2012 | 06 | 2012 | Eliminate or reduce compressed air usage | $3,118 | - | |
| UD0855 #05 Y:2012 | 05 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,665 | $1,000 | |
| UD0855 #04 Y:2012 | 04 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $1,089 | - | |
| UD0855 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $19,664 | $91,318 |