ITAC Assessment: WM0001
ITAC logo
ITAC Assessment: WM0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Grey and Ductile Iron Castings
NAICS 331511: Iron Foundries
SIC 3462: Iron and Steel Forgings
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 4,680
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,938 2,036,400
kWh
Electricity Demand $122,345 13,378
kW-mo/yr
Electricity Fees $28,903 -
Natural Gas $22,899 3,246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $435 $200 $326
6,517
kWh
$109
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $362 $30 $271
5,422
kWh
$91
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $488 - - $488
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $2,696 - $2,696
53,918
kWh
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $27,100 $78,000 - - - $27,100
-
lb
06 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $236 $79 - - $236
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $141 $1,000 $120
2,383
kWh
$22
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,227 $1,535 $2,421
48,410
kWh
$806
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,685 $80,844 $5,834
116,650
kWh
$1,515
-
kW-mo/yr
$236
-
MMBtu
$27,100
-
lb
TOTAL IMPLEMENTED $4,165 $2,765 $3,138
62,732
kWh
$1,027
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs