ITAC Assessment: MI0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Propylene
NAICS 325110: Petrochemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 39,921
ft2
Annual Production 27,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,969,780 19,697,804
kWh
Electricity Demand $270,574 27,057
kW-mo/yr
Natural Gas $1,175,529 223,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $94,284 $46,620 $82,894
828,942
kWh
$11,390
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,472 $19,980 $39,102
391,023
kWh
$5,370
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $38,910 $2,520 - - $38,910
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,498 $6,660 $27,698
276,975
kWh
$3,800
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,363 $1,660 $9,113
91,132
kWh
$1,250
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,797 $2,726 $3,337
33,371
kWh
$460
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,893 $80 $2,543
25,427
kWh
$350
-
kW-mo/yr
-
08 2.7145: Install skylights $2,227 $960 $1,747
17,472
kWh
$480
-
kW-mo/yr
-
TOTAL RECOMMENDED $228,444 $81,206 $166,434
1,664,342
kWh
$23,100
-
kW-mo/yr
$38,910
-
MMBtu
TOTAL IMPLEMENTED $54,393 $5,220 $13,403
134,031
kWh
$2,080
-
kW-mo/yr
$38,910
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs