Assessment Year | 2012 |
---|---|
Principal Product | Propylene |
NAICS | 325110: Petrochemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
39,921
ft2
|
Annual Production | 27,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,969,780 | 19,697,804 |
kWh
|
$0.100 |
Electricity Demand | $270,574 | 27,057 |
kW-mo/yr
|
$10.00 |
Natural Gas | $1,175,529 | 223,060 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $228,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,393 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $94,284 | $46,620 |
$82,894
828,942
kWh
|
$11,390
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,472 | $19,980 |
$39,102
391,023
kWh
|
$5,370
-
kW-mo/yr
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $38,910 | $2,520 | - | - |
$38,910
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,498 | $6,660 |
$27,698
276,975
kWh
|
$3,800
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,363 | $1,660 |
$9,113
91,132
kWh
|
$1,250
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,797 | $2,726 |
$3,337
33,371
kWh
|
$460
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,893 | $80 |
$2,543
25,427
kWh
|
$350
-
kW-mo/yr
|
- | |
08 | 2.7145: Install skylights | $2,227 | $960 |
$1,747
17,472
kWh
|
$480
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $228,444 | $81,206 |
$166,434
1,664,342
kWh
|
$23,100
-
kW-mo/yr
|
$38,910
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,393 | $5,220 |
$13,403
134,031
kWh
|
$2,080
-
kW-mo/yr
|
$38,910
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs