Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,368

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0069 #03 Y:1993 Install occupancy sensors $486 $768
UF0069 #02 Y:1993 Install spectral reflectors / delamp $776 $2,256
UF0069 #01 Y:1993 Utilize higher efficiency lamps and/or ballasts $2,381 $1,705
ND0157 #07 Y:1993 Insulate bare equipment $427 $2,355
ND0157 #06 Y:1993 Lower temperature during the winter season and vice-versa $880 $125
ND0157 #05 Y:1993 Insulate bare equipment $98 $101
ND0157 #04 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $352 $300
ND0157 #03 Y:1993 Install compressor air intakes in coolest locations $657 $600
ND0157 #02 Y:1993 Utilize higher efficiency lamps and/or ballasts $368 $864
ND0157 #01 Y:1993 Use most efficient type of electric motors $2,365 $2,297
UD0405 #04 Y:1993 Reschedule plant operations or reduce load to avoid peaks $548 $1,000
UD0405 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $1,176 $2,511
UD0405 #02 Y:1993 Use properly designed and sized hvac equipment $2,743 $2,000
UD0405 #01 Y:1993 Upgrade controls on compressors $2,213 $100
ND0156 #05 Y:1993 Utilize higher efficiency lamps and/or ballasts $104 $112
ND0156 #04 Y:1993 Install vinyl strip / high speed / air curtain doors $580 $1,280
ND0156 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $1,433 $1,025
ND0156 #02 Y:1993 Analyze flue gas for proper air/fuel ratio $4,235 $500
ND0156 #01 Y:1993 Use most efficient type of electric motors $1,182 $2,631
WI0181 #13 Y:1993 Reschedule plant operations or reduce load to avoid peaks $350 $350