| Assessment Year | 1993 |
|---|---|
| Principal Product | Contract packaging and machinery |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 165 |
| Plant Area |
34,000
ft2
|
| Annual Production | 2
pieces
|
| Production Hrs. Annual | 5,140
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $482,890 | 6,162,661 |
kWh
|
$0.078 |
| Natural Gas | $113,604 | 32,359 |
MMBtu
|
$3.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,928 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $16,753 | $56,100 | n/a |
$16,753
267,878
kWh
|
- |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $5,475 | $8,970 | n/a | - |
$5,475
-
MMBtu
|
| 03 | 2.7241: Install outside air damper / economizer on hvac unit | $5,109 | $10,500 | n/a |
$5,109
75,322
kWh
|
- |
| 04 | 2.7226: Use computer programs to optimize hvac performance | $2,410 | $10,000 | n/a |
$2,410
30,774
kWh
|
- |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,292 | - | n/a |
$2,292
29,308
kWh
|
- |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,345 | $7,884 | n/a |
$12,345
157,679
kWh
|
- |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,468 | $7,899 | n/a |
$5,468
69,754
kWh
|
- |
| 08 | 2.7135: Install occupancy sensors | $1,462 | $1,425 | n/a |
$1,462
18,757
kWh
|
- |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $3,196 | $1,600 | n/a |
$3,196
40,739
kWh
|
- |
| 10 | 2.2437: Recover waste heat from equipment | $2,175 | $2,000 | n/a | - |
$2,175
-
MMBtu
|
| 11 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $996 | - | n/a |
$996
-
kWh
|
- |
| 12 | 2.3132: Recharge batteries on during off-peak demand periods | $897 | $897 | n/a |
$897
-
kWh
|
- |
| 13 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $350 | $350 | n/a |
$350
-
kWh
|
- |
| TOTAL RECOMMENDED | $58,928 | $107,625 |
$51,278
690,211
kWh
|
$7,650
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs