ITAC Assessment: ND0157
ITAC logo
ITAC Assessment: ND0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Toiletries, automotive fluids
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 150,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,215 1,577,374
kWh
Natural Gas $79,556 24,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,365 $2,297 $2,365
29,601
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $368 $864 $368
5,275
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $657 $600 $657
8,206
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $352 $300 $352
4,396
kWh
-
05 2.2511: Insulate bare equipment $98 $101 - $98
-
MMBtu
06 2.7221: Lower temperature during the winter season and vice-versa $880 $125 - $880
-
MMBtu
07 2.2511: Insulate bare equipment $427 $2,355 - $427
-
MMBtu
TOTAL RECOMMENDED $5,147 $6,642 $3,742
47,478
kWh
$1,405
-
MMBtu
TOTAL IMPLEMENTED $3,597 $2,722 $2,717
33,997
kWh
$880
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs