ITAC Assessment: UF0069
ITAC logo
ITAC Assessment: UF0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom Steel Bridges
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 150,000
ft2
Annual Production 5,000
ton
Production Hrs. Annual 4,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,017 758,206
kWh
LPG $6,061 650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,381 $1,705 $2,381
24,326
kWh
02 2.7144: Install spectral reflectors / delamp $776 $2,256 $776
8,206
kWh
03 2.7135: Install occupancy sensors $486 $768 $486
5,275
kWh
04 2.4133: Use most efficient type of electric motors $2,295 $2,669 $2,295
22,860
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,049 $1,000 $3,049
30,188
kWh
06 2.8114: Change rate schedules or other changes in utility service $16,058 - $16,058
-
kWh
TOTAL RECOMMENDED $25,045 $8,398 $25,045
90,855
kWh
TOTAL IMPLEMENTED $23,783 $5,374 $23,783
77,374
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs