*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Packaged Salads
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 800,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $693,334 29,450,176
kWh
Electricity Demand $730,477 73,327
kW-mo/yr
Electricity Fees $123,809 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $313,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $312,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $18,246 $675 $5,567
229,191
kWh
$11,809
-
kW-mo/yr
$870 - - -
02 2.4323: Use optimum size and capacity equipment $3,110 $3,500 $486
19,930
kWh
$2,480
-
kW-mo/yr
$144 - - -
03 3.4154: Eliminate leaks in water lines and valves $3,308 $103 $367
15,240
kWh
$248
-
kW-mo/yr
- $1,379
-
Tgal
- $1,314
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,090 $1,450 $1,863
76,788
kWh
$3,939
-
kW-mo/yr
$288 - - -
05 3.4155: Meter waste water $14,720 - - - - - - $14,720
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,120 $4,300 $1,072
43,962
kWh
- $48 - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,000 $4,908 $3,274
134,818
kWh
$2,480
-
kW-mo/yr
$246 - - -
08 2.4133: Use most efficient type of electric motors $1,205 $66 $598
24,619
kWh
$535
-
kW-mo/yr
$72 - - -
09 3.5317: Sell / offer by-product as animal feed $260,000 $49,800 - - - - $260,000
-
lb
-
TOTAL RECOMMENDED $313,799 $64,802 $13,227
544,548
kWh
$21,491
-
kW-mo/yr
$1,668 $1,379
-
Tgal
$260,000
-
lb
$16,034
TOTAL IMPLEMENTED $312,594 $64,736 $12,629
519,929
kWh
$20,956
-
kW-mo/yr
$1,596 $1,379
-
Tgal
$260,000
-
lb
$16,034
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs